Project Facts & Figures

AURASYIA and Associates will not spare any effort or resources to present Iraq with a World Class Facility Built to BOC Specifications & Needs.

Estimated Costs

Total project cost breakdown of $3.5 - 4 Billion US Dollars across all phases.

View Details →

Manpower Needed

1,500 total personnel with skilled positions, housing, and facilities on-site.

View Details →

Project Structure

Organizational chart and project governance framework overview.

View Details →

Project Overview

Three options were discussed with Basra Oil Company (BOC), and out of several configurations, we chose a 24 Tank & Auxiliaries option to make the project financially viable and profitable for both the investor and BOC. This configuration delivers maximum capacity while maintaining operational efficiency and cost-effectiveness.

The project's strategic purpose is to receive, store, and load crude oil and different petroleum white products on oil tankers, assisting Iraq to reach its goals to restore its export quota with minimum costs and a shorter period of time. The facility will be a world-class installation built to BOC specifications and international standards.

Tank Drawing - Technical Specifications

Technical drawing of the tank farm layout and specifications.

Water Tanks

Large-scale crude oil storage tanks similar to the proposed facility.

Tank Farm Facility

Aerial view of a tank farm facility comparable to the Basra project design.

Oil and Gas Operations in Iraq

Oil and gas operations infrastructure in the Basra region of Iraq.

Key Project Specifications

The 24-tank configuration delivers exceptional capacity and operational capability for Iraq's crude oil export infrastructure.

Estimated Costs

Estimated Costs of the Project are 3.5 – 4 Billion US Dollars divided as follows:

Description Cost (USD)
Consultancy & Administration $80,000,000
Site Preparation & Civil Work (Onshore) $525,700,000
Tank Farm Supply & Installation $1,766,381,000
Pipelines Supply & Installation $776,146,000
Island & Loading Terminals $957,711,000
50 MW Power Station $163,750,000
Fire Fighting & Spill Equipment $51,837,000
Civil Buildings & Utilities $263,412,000
Base Total $3,808,791,000
Contingency (7%) $266,615,000
Gross Total $4,075,406,000

Estimated Manpower Needed

The project will require a substantial workforce across multiple disciplines, with dedicated housing and facilities to support long-term operations.

Project Structure

The organizational chart below outlines the governance and management framework for the Basra Oil Tank Farm & Loading Terminals project.

Project Organizational Structure Chart

Support the Development of an Oil Tank farm and Offshore Loading Terminals and Subsidiaries in Iraq.