AURASYIA and Associates will not spare any effort or resources to present Iraq with a World Class Facility Built to BOC Specifications & Needs.
Total project cost breakdown of $3.5 - 4 Billion US Dollars across all phases.
View Details →1,500 total personnel with skilled positions, housing, and facilities on-site.
View Details →Three options were discussed with Basra Oil Company (BOC), and out of several configurations, we chose a 24 Tank & Auxiliaries option to make the project financially viable and profitable for both the investor and BOC. This configuration delivers maximum capacity while maintaining operational efficiency and cost-effectiveness.
The project's strategic purpose is to receive, store, and load crude oil and different petroleum white products on oil tankers, assisting Iraq to reach its goals to restore its export quota with minimum costs and a shorter period of time. The facility will be a world-class installation built to BOC specifications and international standards.
Technical drawing of the tank farm layout and specifications.
Large-scale crude oil storage tanks similar to the proposed facility.
Aerial view of a tank farm facility comparable to the Basra project design.
Oil and gas operations infrastructure in the Basra region of Iraq.
The 24-tank configuration delivers exceptional capacity and operational capability for Iraq's crude oil export infrastructure.
| Description | Cost (USD) |
|---|---|
| Consultancy & Administration | $80,000,000 |
| Site Preparation & Civil Work (Onshore) | $525,700,000 |
| Tank Farm Supply & Installation | $1,766,381,000 |
| Pipelines Supply & Installation | $776,146,000 |
| Island & Loading Terminals | $957,711,000 |
| 50 MW Power Station | $163,750,000 |
| Fire Fighting & Spill Equipment | $51,837,000 |
| Civil Buildings & Utilities | $263,412,000 |
| Base Total | $3,808,791,000 |
| Contingency (7%) | $266,615,000 |
| Gross Total | $4,075,406,000 |
The project will require a substantial workforce across multiple disciplines, with dedicated housing and facilities to support long-term operations.
The organizational chart below outlines the governance and management framework for the Basra Oil Tank Farm & Loading Terminals project.
Get in touch with us to answer any questions you may have or if you're interested in supporting or investing in The Basra Crude Oil Tank Farm & Offshore Loading Island and Terminals project.
Contact us